Evidence cut: 24 September 2026. Open the update, extended to 5 October (twelve dated signals and the watch list). Back to the folder · Start here
EKU Live Radar
KanbinaLUMINA

EKU Power Drives · live competitive radar · evidence cut 24 September 2026

Mixed-brand is now shared ground. The proof still open is how a whole site behaves when the cloud link drops.

Sixteen rival moves checked at their own source, Caterpillar ECS included at leadership's request. ComAp documents load sharing across controller brands on one site, and Generac sells in the United States a fleet cloud that monitors generators from several makers; whether Pramac Link in Europe is the same product is a Working Hypothesis. None of the rivals on this radar publishes measured behavior of a whole site with the cloud down: that is the proof EKU can publish first.

Updated 24 Sep 2026 Leadership: 2 min in Summary Sales: go to For sales New to the topic: start with Glossary

The month in four numbers

Rivals moved toward EKU's ground, and one proof is still open.

16

rival moves and documents checked at their own source

Vendor releases, release notes, product pages and filings, read 4, 9, 14, 23 and 24 Sep 2026.

6

sell the same promise as Maximus with more scale behind it (high risk)

Kanbina Lumina threat read, 24 Sep 2026: Pramac Link, Generac Link Manager, ComAp Advanced Reporting, ComAp ICCC, mtu EnergetIQ, Caterpillar ECS.

1

rival documents local load sharing across controller brands on one site

ComAp ICCC documentation, read 23 Sep 2026: DSE and DEIF models, up to 32 controllers. Confirmed.

0

rivals on this radar publish measured behavior of a whole site with the cloud down

Rival releases, datasheets and case pages, 4 to 24 Sep 2026. An observation about what is published, not a claim that EKU is the only one able to do it.

What you are looking at. Four numbers from one sweep of 16 moves by 11 companies. The first three say the market moved toward the ground EKU claims. The last one says where EKU can still get ahead: showing, with measurements, what a whole site does by itself when the internet link to the cloud drops.

Story Room · four scenes, five minutes

Rivals moved closer, the words are taken, the gap is public proof, and three assets close it.

What leadership decides this week

Three owners with dates unlock the proof; one gate decides whether data centers open.

Tap a pin to see what is missing and what it unlocks. All four are Needs Validation until EKU names an owner and a date.

What is new in this version

One page now replaces four: the competitive radar in English and in Spanish, the radar visual and the live radar.

  • Sweep of 23 and 24 September 2026: see the first card in What changed.
  • Caterpillar ECS added at leadership's request on 24 Sep: release, data sheets, brochure and VisionLink read at source. Other makers' genset controls from a named list, one controls group per site; no ECS launch announced from April to September 2026.
  • Titles rewritten as plain conclusions; every technical term explained in the Glossary.
  • Trackunit figure aligned to 6.5 million connected assets (Trackunit, 27 Apr 2026) everywhere.
  • Owners named by role, never by person.
For use inside EKU