Start here / 11 Priority stack

Commercial Priority Stack

Start with what is known; leadership's inputs make it sharper

Waiting for perfect figures costs more than acting on sound ones.

What can start tomorrow morning without asking anyone?

Priority stack of 30 September 2026

This page as PDF

P0

By 16 and 31 Oct

Inputs, access and the first two pages. Nothing downstream moves without them.

P1

Q4 2026

Installed-base upsell, packagers, radar, the proof asset, press.

P2

Q1 2027

Segments and cases that need a validation first.

Hold

Not now, and never

Spend that waits for results, and practices EKU does not use.

The order of attack, left to right

P0Inputs and access by 16Oct; two pages by 31 OctP1Q4: upsell, packagers,radar, proof asset, pressP2Q1 2027: data-centerpage, mining annex, cases two and HoldPaid media, events, CRM:after the December review
Each stage starts when the previous one delivers its input. Dated 30 September 2026.

Who does what, and when: the framed box starts now

Now
Next
The team runs it
Starts now, on what is known
  • Mark the five key events
  • Ship the website changes marked ready
  • Publish the Power Generation landing and the Maximus hub by 31 Oct
  • Start the Monday radar read
  • Capture wave 1 of the locked prompts
Runs through the year
  • Upsell play on the installed base
  • Priority packager list
  • Measure whole-site behavior with the cloud link down
  • Case one, then press; cases two and three in Q1
Leadership sharpens it
Inputs that replace estimates
  • Return the field case with corrected figures
  • Confirm the technical wording
  • Confirm the revenue-map ranges
  • Grant editor access and write four names
Decisions that open later pages
  • Decide public use of the category term
  • Validate data centers as a named segment
  • Approve the mining positioning sentence
  • Decide the Spanish editions for three sellers
Kanbina Lumina classification of the priority stack, 30 September 2026. Now: October 2026. Next: the following two quarters. The framed box starts on what is already in the files; leadership's inputs sharpen it as they arrive.
PriorityWhatWhoHowSupport in this repositoryWhat forBy whenDone whenThen
P0Return the field case with corrected figuresLeadership, then the marketing leadCorrect the figures in the editable file. Publish the page, the FAQ and the one-page summary.Folder 07First published proof. Opens the press path.16 Oct 2026The corrected file returned, every figure marked engine data or savings. Publication follows the roadmap, in November.Send three pitches; add the case link to the battlecard and to every proposal.
P0Confirm the technical wording with engineeringLeadership with the engineering leadKeep, reword or remove each line of the list.Leadership inputs, with the full listWebsite copy and battlecard lines use it.16 Oct 2026Each line of the list marked keep, reword or remove.Move the confirmed lines to public copy the same week; drop the rest from drafts.
P0Confirm the revenue-map inputs in writing, or share the CRM exportLeadershipAnswer the five inputs in the Revenue map closing note.Revenue map closing noteThe ranking becomes the base for targets.16 Oct 2026Email or export received; ranking re-run and dated.Re-run the ranking and update the targets in the roadmap, with a dated note.
P0Grant editor access to the website, analytics and social accounts; mark the key eventsLeadership and the web administrator; the analytics owner marks the eventsGrant access; mark the five key events of the channel plan, downloads first.Website change planAccess starts the website changes; events turn visits into business signals.16 Oct 2026Logins working for the marketing lead; the events that need no website change reporting. The kit event is tested the day the kit is published.Start the changes marked ready the next morning. Follow each remaining row's gate.
P0Ship the first buyer-language pages: Power Generation landing and the Maximus ecosystem hubMarketing lead with the web administratorPaste the approved blocks, add FAQ and structured data, request indexing.On-page pack
Approved language
The sign on the street: the first two pages a buyer with a problem can find.31 Oct 2026Both pages live and showing impressions in Search Console.Check indexing after one week; read the four open terms at the 27 Nov review.
P1Upsell play for the installed base (fleets already running GeneSys or Sophia)Sales lead for Power GenerationList the sites; call with the brand-count question; offer the ecosystem as the next step.Battlecard
Revenue map
Shortest path to connected units in 2027.Nov 2026Every installed site contacted once; outcomes logged.Log each conversation outcome; feed objections into the battlecard.
P1Priority packager list with one seller as counterpartSales lead with leadershipRank packagers by upcoming bids; hand each the fleet question and the one description.Ecosystem and channel rolesAbout 70% of revenue flows through packagers (leadership interview, 24 Jul 2026).Nov 2026Named list with a seller per packager and a first meeting dated.Review the list monthly; add the packager kit in Q1.
P1Weekly radar read, and technical validation of the battlecard comparison tableMarketing lead and engineering leadThirty minutes each Monday, following the routine in the radar update.Radar updateTurns rival moves into product and sales answers.from Oct 2026Four dated radar entries a month; comparison table confirmed by the engineering lead.When an answer changes, tell the sellers the same day.
P1Proof asset: measured whole-site behavior with the cloud link downEngineering leadRecord response time, hours sustained, repeatability and the offline sequence on one real site.Radar, proof sectionThe rival documents read hold no measured report of a whole mixed-brand site with the cloud link down.Q4 2026Dated report with the four numbers, confirmed by engineering, and a page that publishes it.Publish as a dated page; pitch it as the lead story.
P1Press path from case one: three pitches a quarter from an EKU addressMarketing leadUse the outlet list and the pitch angles on the map.Press target mapThird-party citations feed AI answers.after case oneThree pitches logged per quarter with outlet, date and answer.Track which outlet answered; reuse every published mention on the website.
P2Data-center subpage of Power GenerationMarketing leadUse the gated brief once leadership validates the segment.Brief 6Segment open in practice, not yet validated for public material.after segment validationWritten go from leadership; page live with one validated proof.Add it to the monthly reading.
P2Mining and regional annexMarketing leadApprove the positioning sentence first; then publish the annex pages.Folder 08Content is ready and waits for approval.after approvalPositioning sentence approved; annex pages live.Hand to the regional sellers.
P2Cases two and three, Spanish versions of all casesMarketing leadSame structure as case one.Folder 07Three reference cases by mid-2027.Q1 2027Three case pages live; Spanish versions attached.Add each case to the press path.
P2Spanish editions of the battlecard and the field voice for the Argentina, Chile and Bolivia sellersSales lead, after a leadership decisionTranslate the two files from this repository; keep them in the sales team's own space, not in the English repository.Battlecard
Field voice
Three sellers work in Spanish; the repository is English by decision.after decisionReview the Spanish copies at each battlecard update.
Not nowPaid media, event sponsorship, a full battlecard library, a CRM buildSpend and scale wait until the December review reads the Q4 results.
NeverAnonymous accounts or invented customer stories on forumsOnly transparent participation with an identified EKU voice.
Trade-offs only leadership can decide

Closing

Strategic conclusion

The content exists. What comes first is inputs and access.

Commercial implication

Working Hypothesis: the longer publication waits, the longer the four buyer terms stay open. The next monthly reading tests it.

Recommended use

Leadership reads the P0 rows and answers them. The marketing lead tracks every row in the workbook sheet "Priorities".

Validation status. Order derived from the Revenue map verbal inputs and the roadmap; final when the Revenue map confirmation arrives. Owners are roles until leadership names people. Dated 30 September 2026.

Working foundation for executive review. Not approved external copy. Prepared for EKU Power Drives, 30 September 2026, by KanbinaLUMINA